Strategically located in El Cedro, Miches, Dominican Republic, and with a wide area of more than 600,000 square meters, Tosca Lagoon promises to be an extraordinary ecological development, where 50% of the land is designated as green areas and recreational, in addition to having a large lake bordered by a beautiful ecological path, perfect to recreate, walk or exercise in tranquility and with excellent security.
An ecological residential of various architectural designs offering projects of buildings, boutique hotels, single and duplex villas and commercial areas. We will also have an underground electrical system 2 entrances with access control to the complex, and private entrance in each residential area within Tosca Lagoon, always guaranteeing a
24/7 security service.
Location:
– direct access to Autovia Miches – Punta Cana
– next to Montaña Redonda
– 17 km to Miches
– 15 min to Playa Esmeralda
– 10 min to Playa El Limon
– 45 min to Punta Cana International Airport
Amenities of the project:
• Large green areas
• Ecological pathway
• Children’s parks
• Infinity Pool for kids and adults
• Pet park
• Indoor and outdoor gym
• Sports zone
• Modern Casa Club
• Restaurants
Termination:
• High resistance aluminum and glass profiles
• Imported porcelain floors or micro cement
• Modern modular kitchens
• Natural granite countertop in kitchen
• Ceramic or natural stone sink with solid wooden top
• Coatings in natural slabs or porcelain tile in bathrooms
• High quality faucets
• Sanitary appliances of modern styles
• Imported precious wood doors
• White walls and natural flagstone coatings inside and outside the building.
A furniture package will be available on additional cost. Jacuzzy included in the penthouses.
available units at Sealand
1 BR / 1 BTH 1st floor starting at 149.990 USD
2 BR / 2 BTH 1st floor starting at 169.990 USD
2 BR/ 2 BTH penthouse starting at 199.990 USD
Payment terms:
reserve with USD 2,000.00
20 % on contract signing within 30 days
40 % during construction
40 % against delivery or with bank financing
Delivery date: 4 phases March through December 2025
Compare listings
Compare